Question:

Waterproof membrane in the escape when the full shop, empty shop, shop, shop what is the difference?

Waterproof membrane in the escape when the full shop, empty shop, shop, shop what is the difference?

Answer:

3, point shop paving the membrane, the membrane and the base layer with point-like bonding. Requires no less than five points per square meter of bonding. Each paste area of 100mm * 100mm. Between the point and the point should be equidistant plum-like distribution (the method can be used at the grass-roots level coating, coiling point of the membrane point coincidence).
2, the shop laying the membrane, the membrane and the grass-based use of sticky. Requiring each web and the base of the bonding surface of not less than two, each paste width of not less than 150mm. The paste is located under the web and coil.
Coil construction process: 1, full of paving the film, the membrane and the base layer with all sticky.
4, empty shop paving the membrane, the membrane and the grass is only within a certain width around the bond. Waterproof layer must have heavy objects covered.