Construction pointsGrassroots should reach the surface not sand, not skin, not grey, no hollowing, no grease. Touch without roughness. If the requirements are not met, the ground should be treated first.The positioning line pop-up perpendicular to each other, and according to the laying of parquet patterns.The back surface of the base plate and the plastic floor plate is coated at the same time, and the adhesive surface can be posted when the adhesive surface is not sticky.The bulk of each with a piece of, will more than rubber extrusion in a timely manner with clean cotton silk.Paving is completed, it is necessary to promptly clean the floor surface, the use of water-based adhesives can be wiped with a damp cloth, the use of solvent based adhesives, the use of turpentine or gasoline to wipe the gel marks
(3) plastic floor:Cutting, processing, scraping and wire grass, paste, rolling, curing.
(2) soft plastic floor plate:Primary treatment, elastic line, plastic floor wax, degreasing, pre laying groove blanking, scraping, paste, welding, rolling, maintenance.
The main construction process of laying plastic floor.(1) semi rigid plastic plate:Primary treatment, elastic line, plastic floor wax, degreasing, scraping, laying, maintenance, rolling stick towel.