Question:

What are the main safety problems when dismantling the scaffold

What are the main safety problems when dismantling the scaffold

Answer:

5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.