What are the requirements for the removal of scaffolding
3, to the lower part of the scaffolding removed the last of a long pole, should be first in proper position of the erection of temporary bracing reinforcement, and then remove the wall; and by dividing the facade scaffolding removed when the ends do not remove scaffolding, should be set up the wall and cross bracing reinforcement according to the provisions
For example, fastener type scaffolding, demolition should be met: 1, the demolition work must be from top to bottom layer, the upper and lower non simultaneous operation of 2, the wall must be removed with the scaffolding layer by layer, even the non first wall pieces of the whole layer or several layers removed after removal of the scaffolding dismantled; height should be less than 2 step, such as the height difference is greater than 2 steps should be added to the reinforcement of diaphragm wall
There are several types of scaffolding, such as fastener type scaffolding, bowl buckle scaffolding, scaffolding scaffolding, the demolition of the basic content of similar, but there are differences