Transportation: when transporting pipes by car, two or more pieces of wood should be placed on the platform. The tubes are placed on the wood and fixed with wedges. The pipe out of the car parts shall not exceed the length of 1/4 in vitro. When more than one layer of pipe is installed, the direction of the pipe shall be reversed in each layer, and cushion or cushion shall be added between the two layers of pipes. Finally, the wire rope and cushion are fixed firmly. In the process of transportation, check the risk of falling pipe frequently, check whether the stop wedge is loose, slow down when the road is rough or sharp turn.
Pile up: when the pipe is stacked, the lower part of the pipe should be covered with a tie or cushion block. The socket of the pipe is interlocked with each other, and the stop wedge must be put in place to prevent the pipe from rolling. Not allowed to be piled on marshes, rough slopes, or badly polluted areas.
Lifting: be careful lifting pipe, don't let the pipe shaking, lifting pipe by wire rope, sling and special sling, wire rope no single, for the protection of pipe coating, rubber or similar materials can be used to wrap up the rope. The use of hook, for the protection of the cement lining layer is not damaged, will hook with rubber or similar material wrapped up, especially in the hoisting of large diameter pipe, will not be fixed in the socket with hook in end strip or pipes.