(5) remove the material, structural parts, etc., it is strictly prohibited to throw down, the use of rope tied firmly slow down, or with a crane, basket and other means of transport to the ground.(6) the scaffolding removed, should make clear the workplace after work, all materials and components should be neatly stacked, safe and stable, and timely transport.
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.