What are the sewage treatment methods for the boiler?
Before the sewage boiler water level in the normal high water level, the boiler pressure in the 0.1-0.2MPA when carried out in the "diligent row, small row, even row row" principle (at least once a day), short intermittent, that is,
At least every year on the base and other exposed parts of the floating rust clean and paint once.
Horizontal fuel (gas) boiler for 12 months after the opening of the smoke door to clean up the furnace or pipe fouling, check whether the smoke box cement off, and off the Department of repair.
Boiler pressure gauges, safety valves and other safety accessories should be regularly checked to ensure its reliability (pressure gauge every six months at least once, the safety valve at least once a year).
, And then open again, so repeated several times, until the water level in the normal low water level can be.