Home > categories > Electrical Equipment & Supplies > Other Wiring Accessories > What are the test requirements for the power cord?
Question:

What are the test requirements for the power cord?

What are the precautions when installing the shower room?

Answer:

The first, the size of the embedded hole should be designed in the bathroom before the decoration; second, leakage protection switchgear wiring should be installed before the shower room to consider good, so as not to rework; Third, the shower room style according to the bathroom layout Fourth, the shower room must be connected with the building structure to be strong; Fifth, if the installation of the shower room has been installed before the water supply system and tiles, the best custom shower room.
Some technical changes are not limited to the transformation of production equipment, including the expansion of production scale, product upgrades, new or transformation of the plant, the purchase of more advanced production lines are all technical transformation
For example, in order to meet the new production process requirements, it is possible to the original production line equipment and ancillary facilities for technical updates or transformation; add new products, the use of some of the original equipment to transform at the same time and then add some new equipment to meet the production of new products Need to; in order to improve product quality and production efficiency of the original production line to conduct a comprehensive technological transformation and upgrading of new products, special technology research and development, these areas are the need for technical changes in the content
Cable factory needs constant innovation and development, should deal with production technology, technology, equipment, facilities and other technical updates and transformation to meet the new products, new production technology and enterprise development requirements