What equipment test mode of operation
(2) Equipment load test: The test equipment is tested under several standard load conditions and, in some cases, tested.
A certain amount of empty load operation is an indispensable step that the new equipment must be run before it is put into use.
(1) Idling experiment: is to assess the installation of equipment to maintain the accuracy of the stability of the equipment, as well as transmission, manipulation, control, lubrication, hydraulic system is normal, sensitive and reliable, and other parameters and performance in the absence of Beethoven operation
Equipment test run can be divided into idle test, load test, precision test three.
In the load test should be standardized to check the bearing temperature, assessment of hydraulic systems, transmission, operation, control, safety and other equipment work to meet the factory standards, whether normal, safe and reliable.