This cable or accessory has not been certified and may not be able to work with this iphone reliably
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
The operation of the hydraulic pipe is very simple to see it will engage in their own, embedded more simple, and then get the construction site in accordance with the requirements of the drawings put away, tied with tie wire on the OK Mouth up the pipe to use cement bag to prevent good, to prevent the infusion of concrete, so buried even if the end
Multi-core cable should be cable number, if not, should first use the table to find and put on the line with the tube.