Home > categories > Machinery & Equipment > Concrete Machinery > What is the difference between a bored pile and a spin pile
Question:

What is the difference between a bored pile and a spin pile

What is the difference between a bored pile and a spin pile

Answer:

In different ways... The bored pile is a pile of dirt, and the pile is a non-crowded pile The scope of the pile varies A lot of! Don't say all...
Cyclotron is drilling mud circulation is way out of the mud, spin dig a hole in the form of power head, using the powerful torque directly to soil or gravel and rotary drilling slag mining, then using rotary digging bucket quickly hole is out of dry soil is put forward. By contrast, drilling holes are more efficient and less polluting
There is no essential difference. One is through a long spiral drill which is drilled through a rotary drill. Filling pile is refers to the construction site by mechanical drilling, steel tube compaction or formed in the human mining method in the foundation soil pile hole, and placed in them made of reinforcing cage, pouring concrete piles, according to the different pore forming methods, can be divided into the immersed tube pile holes bored piles and bored piles and piles of several categories.

Share to: