What is the installation of soft film ceilings?

What is the installation of soft film ceilings?

Answer:

When all the installation of soft film ceiling aluminum alloy keel fixed after the installation of soft film. First open the soft film with a dedicated heating air gun full heating evenly, and then use a special plug to the soft film tension inserted into the aluminum alloy keel, and finally the more around the soft film can be trimmed. After installation, use a clean towel to clean the soft film ceiling.
Before installation to the site to check whether the conditions of the installation of keel, the scene is completed the wall, carpentry part of the processing is qualified, need to plaster part of the first completed, with particular attention to the carpentry part must be done in accordance with the requirements, lights, To be processed in advance. Site conditions Licensor approach construction, first of all according to the design requirements of the carpentry part of the fixed aluminum alloy keel keylone, pay attention to the corner of the angle must be smooth and smooth, Note that the lighthouse, tuyere, light pipe plate with the surrounding keel level, and requires a firm and smooth can not swing before. Smoke, ceiling, the first positioning to do a wooden chassis, wood bottom to the bottom of the polished smooth, and pay attention to the level of height, too low to easily highlight the traces of the chassis. Before installing the smallpox, carefully check the keel joints are solid and smooth, sprinkler to glue the white tape, the outlet to deal with good. Install the ceiling when the first to both sides of the fixed, while attention on both sides of the size, pay attention to the seam to be straight to do the final position, pay attention to smooth and smooth. After doing so to remove the extra smallpox pruning. To achieve the perfect edge effect. Open the hole in the hole to do a good job on the mark, the PVC lamp ring carefully stick to the bottom of the soft film, to be firmly after the removal of the small ceilings can be. Ventilation, light pipe handle processing is to find the location of the mouth of the mouth of the light pipe, with the same around, the soft film installed on the aluminum alloy keel, pay attention to the corner to be flat. After the cut out of the extra smallpox can be. Finally, clean the soft film ceiling with a clean towel.
According to the design requirements of the drawings, in the need to install soft film ceiling at a level of height around the fixed 4X4Cm support keel (some local area is relatively large when the block installation required to achieve good results. ). When all the wooden sliver is required to be fixed, then the aluminum keel will be fixed on the bottom of the keel.

Share to: