What is the maintenance method of concrete pump?
Vertical pipe should be no less than 10m with a check valve of the horizontal tube, is strictly prohibited vertical tube directly connected to the concrete pump output.
Disassembly Pipeline cleaning should be taken before the anti-pumping method to clear the pressure of the pipeline.
Concrete pump should be placed in a solid flat ground, put down the legs, the body placed smoothly.
2) Before the operation should be checked to confirm the electrical equipment and instruments normal, the various parts of the switch button, the handle are in the correct position, the mechanical part of the fastening point of solid, reliable, chain and belt tightness to meet the requirements of the transmission parts of the normal operation.