How do you pile it?According to different pile, talk about some details
The diameter ranged from 300-600.Cast-in-place pile is a kind of civil engineering and construction of various types of pile foundation. It is the use of hammer piling equipment or vibratory piling equipment, with reinforced concrete pile tip (or plate boots) or with a valve type steel pipe into the soil pile shoe (steel pipe diameter and pile design should be the same size), caused by the pile hole, and then put into the steel skeleton and concrete pouring, then pull out the casing, using vibration extubation of concrete compaction, forming pile is needed.
Diesel pile hammer is the use of diesel hammer pile and cement pile has made a hammer a hammer to break into the underground, to determine the pile length and diameter according to the needs of geology, precast pile length is generally divided into three meters, six meters, nine meters and fifteen meters.
There are many kinds of piling methods, and different pile drivers are chosen according to different waysIt is better to use a diesel hammer, a pile driver, or an immersed pipe filling pile on a beachThe pile can be operated or tracked