What's the difference between a pile driver and a boring pile driver?
Piling machine generally refers to prefabricated prefabricated pile hoisting, with heavy hammer into the underground or static pressure into the underground machinery. The bored pile machine is the first hole, the next steel cage, and then pouring concrete machinery. The difference is that the pile in the construction of the pile driver is prefabricated.The bored pile machine is a cast-in-place pile on the spot.
Piling can be static pile (precast pile) and other piles; drilling is what we call bored piles and mixing piles
Piling is the use of static or direct impact into a precast pile;Bored pile is the first hole, reperfusion. There are cement mixing pile, powder injection pile, CFG pile and gravel pile and so on.There are many piles in the building and the large pile foundations such as bridges are bored piles. Cement mixing pile, powder spraying pile, CFG pile and gravel pile are used for soft foundation treatment.
Piling machine generally refers to prefabricated prefabricated pile hoisting, with heavy hammer into the underground or static pressure into the underground machinery. The bored pile machine is the first hole, the next steel cage, and then pouring concrete machinery.The difference is that the pile in the construction of the pile driver is prefabricated.The bored pile machine is a cast-in-place pile on the spot
As an example: if a precast concrete pile is used, the pile driver, if it is cast-in-place, such as slurry retaining wall concrete pile, these are drilled Ji