Installation method: 1. First to go to the site to see if there is a condition of installing the keel: Look at the scene to check if the wall is completed, and whether the woodworking processing part is qualified, the plastering needed parts should be completed first. Special attention should be paid to the carpentry part of the requirements we have to do, lights, air vents, such as the size of the opening to be processed in advance. 2. If the on-site situation is permmited, the first is to fix the aluminium?alloy keel according to the requirement of the drawing design. The corner must be flat smooth, and the lighter should be flat and dense. 3. Pay attention to the lamp holder, air port, and light tube plate that need to be on the same level with the aurrounding keel. And it is required to be stable and smooth that can not swing. 4. The smoke and ceiling lamps should be first positioned and make a wooden frame with a smooth surface. Pay attention to the level, if it is too low, it is easy to highlight the traces of the underframe. 5. Before the installation of smallpox, the joint of the keel should be carefully checked, and the spray header should be sticked with the white tape. And the outlet should be handled well. When installing the smallpox, it should be fixed from the middle to the sides. Pay attention to both sides of the size, and the welding seam should be straight to the final corner and the surface should be smooth. After the surrounding is done, the excessive smallpox should be removed. To achieve the perfect side effect.
The installation details of the decorated soft film ceiling: 1. First to go to the site to see if there is a condition of installing the keel: Look at the scene to make sure the wall is completed, and woodworking processing part is qualified, the area that need to be plastered should be completed first. First part plastering carpentry part we proposed must be in accordance with the requirements to do, to advance the processing of.2. entering the construction site conditions Licensor hole size lamp, air outlet, first part is fixed according to the design Aluminum Alloy keel keel carpentry requirements drawing well, attention must be right angle connecting to smooth, flat, dense.3. lamp holder, tuyere, light tube plate to and around the keel level, and firmly cannot swing can smooth.4. smoke, ceiling lamps, the first position to make a wooden frame, wooden frame the bottom surface should be polished, and pay attention to the level of height is too low, it is easy to show a trace of.5. before installing ceiling, carefully check the keel joints are solid and smooth, the spray head to stick on the white tape, an outlet should be well handled. When loading the smallpox to first from the middle to both sides of the fixed, while paying attention to size on both sides and pay attention to welding seam to the final straight angle position, pay attention to smooth. Around the well to the smallpox pruning removes. To perfect income effect on the edge. Turn on the light hole. To mark the position of the lamp hole , and carefully stick the PVC lamp ring carefully and accurately on the bottom of the soft film and then remove the excessive smallpox after it is firm. Find the position of the outlet and the light pipe handicap, just as the surroundings, to install the soft film to the aluminum alloy keel, pay attention to keep the angle be smooth.
1. First to go to the site to see if there is a condition of installing the keel: Look at the scene to make sure the wall is completed, and woodworking processing part is qualified, the area that need to be plastered should be completed first. First part plastering carpentry part we proposed must be in accordance with the requirements to do, to advance the processing of.2. entering the construction site conditions Licensor hole size lamp, air outlet, first part is fixed according to the design Aluminum Alloy keel keel carpentry requirements drawing well, attention must be right angle connecting to smooth, flat, dense.3. lamp holder, tuyere, light tube plate to and around the keel level, and firmly cannot swing can smooth.4. smoke, ceiling lamps, the first position to make a wooden frame, wooden frame the bottom surface should be polished, and pay attention to the level of height is too low, it is easy to show a trace of.5. before installing ceiling, carefully check the keel joints are solid and smooth, the spray head to stick on the white tape, an outlet should be well handled. When loading the smallpox to first from the middle to both sides of the fixed, while paying attention to size on both sides and pay attention to welding seam to the final straight angle position, pay attention to smooth. Around the well to the smallpox pruning removes. To perfect income effect on the edge. Turn on the light hole. To mark the position of the lamp hole , and carefully stick the PVC lamp ring carefully and accurately on the bottom of the soft film and then remove the excessive smallpox after it is firm. Find the position of the outlet and the light pipe handicap, just as the surroundings, to install the soft film to the aluminum alloy keel, pay attention to keep the angle be smooth.