When calculating the installation of water supply and drainage pipelines, are elbow and pipe fittings calculated separately?
Water supply and drainage pipeline engineering, bends and fittings of the material shall be calculated separately, the installation fee is included in the pipeline installation quota, do not need to be calculated, such as industrial pipeline, the pipe installation fee plus
This is not necessarily, to see whether the water quota of pipe fittings, such as Fujian Province, the eighth volume of drainage pipe, plastic pipe and cast iron pipe fixed drainage pipe containing the pipe installation fee and material fee, and the rain cast iron pipe fittings with only the installation fee, material fee does not include fittings. So, when you calculate the amount of work, whether to count, according to your local quota of specific provisions, these in the quota description inside have description.
To calculate the cost of both chambers.. as long as it is in. Including tolls.