Which pay is high and it's easy to find a job? Is it more harmful to your health? Which one should be more tired?
It must be the asphalt mixing plant. Because:1, asphalt mixing building operating room is closed, which is equipped with air conditioning, relatively comfortable. The asphalt paver is a field operation, exposed to the weather.2, asphalt mixing building is relatively fixed, shorter working hours. Asphalt paver relatively longer hours.
If it is asphalt station, control room operation is better, there are air conditioning and other facilities, but the noise is about 70 decibels;Paving machine construction in summer, relying only on the sun block sun block, work environment noise, high temperature, asphalt material temperature is high, the distribution of gas hazards to the body;The two jobs are rather hard, but I think the working environment in the mixing station will be even worse.
3, the most important point: asphalt asphalt construction important pollutants are toxic, in the building because of the relatively closed space mixing effect is smaller, and the asphalt paver space is open, the direct harm of asphalt smoke, health effects.