Which is not included in the price
The installation of steel support at both ends of the height must be controlled at 2 cm or less, supporting deflection is not greater than the length of the L/400 support, the horizontal axis deviation is less than 5 cm.
The best use of the whole hoisting gantry crane, crane from the end of the 5m position.
According to the actual width of foundation pit should do piping pre fight before installation, and do a good job in the middle section, the fixed end, end of the link bolt is related examination completely, have assembled support both ends of center line eccentricity control at 2 cm, after inspected by supporting part number.