Home > categories > Electrical Equipment & Supplies > Power Cords & Extension Cords > Works from the start to the end of the construction sequence
Question:

Works from the start to the end of the construction sequence

Such as the title! For a new chassis, but the power is old-fashioned so short line, and ready to engage in power cpu extension line, everywhere asked not to sell, in Jingdong finally Amoy to the model: ORICO (ORICO) CPE4P-30BRCPU4pin power extension Line, but worry about getting the motherboard? Ask God to reply! The The More

Answer:

Building electrical construction diagram: marked MR is the way to lay the line is the use of metal trunking, 200 * 100 that the size of the metal trunking (width * high). Trunks, also known as cable trough, wiring trough, line trunking (depending on local), used to power lines, data lines and other wire specifications of the finishing, fixed on the wall or ceiling of electrical appliances. Generally have plastic material and metal material two, can play a different role. Generally, the specifications of the metal trunking are 50 mm × 100 mm, 100 mm × 100 mm, 100 mm × 200 mm, 100 mm × 300 mm, and 200 mm × 400 mm.
Cable bridge frame, such as: steel bridge, steel fire bridge, aluminum alloy bridge, glass steel bridge, stainless steel bridge ... ... in accordance with the specifications of 200 * 100 * 1.5 steel bridge should be, but in accordance with the type of points and slot Type bridge, tray tray, trough bridge of the points, the calculation of these bridges are formulas. The calculation formula for the steel bridge is calculated according to the expansion of the bridge area to calculate the weight per meter bridge. Specifically you can believe me.
1 According to the connection hardware in the integrated wiring system to divide the line section: Terminal connection hardware, the middle connection hardware 2

Share to: