Question:

Basement floor mattress dry to what degree can do coil waterproof?

Basement floor mattress dry to what degree can do coil waterproof?

Answer:

Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Second, when the design of the highest groundwater level above the bottom of the basement floor, you must do waterproofing. As the waterproof waterproof effect is good, so the application of more. Internal waterproofing is generally used for repair works.
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
Pull a square coil, tiled on the floor above, in the case of the sun, the sun shines on half an hour, in turn, look at the coil, if no water to prove that the water content is not large, that can be construction.