1 square mull retaining wall is equal to how many square stone
Need to block 1.02 square bar, plus loss, budget fixed injury is the case
Molding concrete construction, the participation of the rough stone is generally about 25% of the volume, the amount of data provided above is one of the need for rough stone 1.15m & amp; Way to verify each other.
Under normal circumstances, the masonry wall mortar label between the M5-M. the construction of stone concrete, the participation of the rough stone is generally about 25% of the volume, the amount of data provided above the amount of one stone needs 1.15m ?. In the use of sand, mud content of less than 3% of the sand in the preparation of mortar, per cubic meter of stone wall with the theoretical mix should be used 60-120kg cement, the actual operation of the cement: sand weight ratio of about 1: 5.5-6 can To ensure that M5 cement mortar strength test qualified construction attention to conservation. Five stone side of the sand, cement two packs.