A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)

Answer:

The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.