can you tell me, 400350260210, his bucket, they can dig a cubic soil, or multiple soil, there is a normal situation, how they work, such as the effect of law: an hour to dig much soil, the more detailed the better, a comprehensive then, after 100 minutes
400 bucket capacity: 1.9m fand350 bucket capacity: 1.6m fand260 bucket capacity: 1.3m fand210 bucket capacity: 1m fandThis depends on what brand you are talking about, such as Carter and Komatsu same tonnage, may be different from the bucket, depending on whether you are standard configuration or heavy configuration, there will be the difference between bucket and bucket. You can ask the number of cubic mining soil, professional concept: the excavator bucket capacity, but the bucket capacity refers to the full mark (according to the bucket is full, but around 45 degrees along the stack), note that the actual earthwork calculation, which can estimate the bucket capacity, but not a little poor.Take the site of the bucket capacity of Yuchai heavy industry, (the various manufacturers of bucket capacity is small, can be found in the official website of the brand or the sales staff at YC210), bucket capacity of 0.9 party, the 1.2 party YC260 bucket capacity, YC360 standard bucket capacity 1.6, YC420 standard bucket capacity 1.9. To calculate the weight, if it is earthwork, then the density is 1.8 tons / square calculation; if the density of stones, according to 2~2.2 tons / square calculation.And efficiency is the various manufacturers are different, and then to our site on the YC360 to a rough estimate, there can be 240~260 cycles per hour, which is roughly by 250 to calculate the bucket, each hour of backhoe loader 250*1.6=400. How many square meters can be excavated in an hour, with the machine tonnage, brand, soil, working conditions, loading position and many other factors, you can first use YC360 to estimate. If you have any questions, you can also ask them. Or you can go straight to the construction site and have a look.
Take the site of the bucket capacity of Yuchai heavy industry, (the various manufacturers of bucket capacity is small, can be found in the official website of the brand or the sales staff at YC210), bucket capacity of 0.9 party, the 1.2 party YC260 bucket capacity, YC360 standard bucket capacity 1.6, YC420 standard bucket capacity 1.9. To calculate the weight, if it is earthwork, then the density is 1.8 tons / square calculation; if the density of stones, according to 2~2.2 tons / square calculation.And efficiency is the various manufacturers are different, and then to our site on the YC360 to a rough estimate, there can be 240~260 cycles per hour, which is roughly by 250 to calculate the bucket, each hour of backhoe loader 250*1.6=400. How many square meters can be excavated in an hour, with the machine tonnage, brand, soil, working conditions, loading position and many other factors, you can first use YC360 to estimate. If you have any questions, you can also ask them. Or you can go straight to the construction site and have a look.I hope I can help you!
This depends on what brand you are talking about, such as Carter and Komatsu same tonnage, may be different from the bucket, depending on whether you are standard configuration or heavy configuration, there will be the difference between bucket and bucket. You can ask the number of cubic mining soil, professional concept: the excavator bucket capacity, but the bucket capacity refers to the full mark (according to the bucket is full, but around 45 degrees along the stack), note that the actual earthwork calculation, which can estimate the bucket capacity, but not a little poor.