Acid resistant brick lining, engineering scaffolding, how to take?
Material preparation: the anti-corrosion materials used in this project are stored in the appropriate warehouse (site), and the incoming materials are tested to comply with the requirements of the HGJ229-91 specification. Equipment preparation: cutting machine, mixer, grinder, trolley, cement plate, rope
Construction preparation, familiar with drawings, specifications, technical disclosure, do a good job of the handover process.