Is the old house, about less than 2 square meters, mainly put the child valve powder mixed with america stumbler overflowing a space for the washing machine. Now is the cement floor, but also relatively old, the above is not very clean, would like to shop on the floor, what materials and tools? Detailed list and usage. What do I need to do? More
Xisha cement Xisha shop in the bottom of the cement level in the new brick below OK
Such as the net height of the room, the general net height of more than 3 meters is possible. But in order to strengthen the adhesion of the new pavement tiles to prevent the future of its empty layer, from the drums of the situation, should be in the original brick with coarse sand or small melon stone stone foundation leveling, the thickness should be 6cm the above. Methods and construction steps: . roughly to the original turn to the hair (the original tiles broken, broken) . clean up the venue. Water rinse the ground later the effect of better . with a roving or small pieces of concrete will be pouring and leveling the ground, can also be a layer of special floor wire buried in the concrete under . to be dry 8 minutes, the general .2 Days after the normal floor tiles can be completed above the ground floor height will increase by 11 cm or so, this will rarely produce construction waste, but the longer duration is not economical. Can also be the original old tiles to play after the laying of new tiles, most of the home decoration using this method, this construction movement, and produce a lot of construction waste. To sum up, it is recommended to choose the appropriate construction method according to the situation of the net height of the house and the house.
1. With the baby valve mixed with the illusation of the scaffolding wiping shovel clear shovel surface .2. With cement glue again, 3. with two packs of cement, 400 kilograms of sand, add water mix, 4. even paved, Brick, 5. Tile first soaked in water, the floor tiles will be put on a piece of land, while the stick with a stick, knocking flat, 6. Corner to use cutting machine, or plan to brick, 7. Maintenance for a whole day After the master