Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
The system can avoid the hot bridge in winter, greatly reducing the indoor heat loss through the external walls; summer can greatly reduce the external radiation from the sun to the indoor heat conduction, and thus the heating, air conditioning energy consumption decline
English: expandedpolystyreneboard molded polystyrene foam board - also known as foam board, EPS board, expandable polystyrene foam board, etc