What is the effect of concrete pouring on the construction quality?
Our usual way is to fight the fuse.
, why should set the flexible pipe, because all the materials are hot and cold shrink, you layout the pipeline When the temperature and your future use when there is a difference in the temperature and the thermal stress when processing, if not Ji plant perfection Dao Ghost voucher set the flexible pipeline, the pipeline will have a lot of internal stress, long-term alternating role will Resulting in pipeline damage, set a lot of places, such as straight pipe, to a certain length must be set, the inflection point also need to set, these settings you can be in the mechanical design manual pipe chapter check out
The use of the trench connection to check the pipe sealing surface is smooth, smooth, no burr. Whether the sealing surface of the sealing ring is scratched, whether the length of the sealing section of the pipe meets the requirements. These three points to ensure that certainly not leaking.