Cuplock scaffolding every 6 meters set a longitudinal scissors is what mean
The utility model also needs to be provided with a scissors support, which aims to ensure the stability of the frame body, avoid the appearance of the slope, improve the safety of the construction, and avoid the occurrence of safety accidents
Means that the bowl buckle scaffold vertical every interval of 6 meters to set up a pair of scissors, out of the vertical rod and bar,
When the inner support mould is set up, is there a horizontal and vertical horizontal bar? Six meters along the vertical direction of the horizontal rod set up a scissors on the line