Does the steel structure belong to high-risk industries?
If only refers to the production workshop construction, should carry on the design first, carries on the pre evaluation, then carries on the appraisal to be possible. It should be no harm to ask experts for advice from more qualified units.
Involving high-risk chemicals (Public Security Bureau), fire control, occupational health, major hazard sources, environmental protection procedures should be handled accordingly, there are three simultaneous reports.
In accordance with the procedures prescribed by the state: first entrust qualified units to prepare the feasibility study report, preliminary design to find a qualified department for construction project, after the application of safety pre evaluation certificates a book, and the Safety Supervision Bureau issued approval certificate, after the completion of the construction for the safety evaluation report for safety production license.