Extension of the abrasive wearable floor material how to construction? Need to pay attention to what the problem?
thickness of 5cm or more The second step: the first sprinkle material: the Tiger Geng Hong Kong Fan Huan song for the offensive power of the provisions of the amount of 2/3 of the extension of abrasive evenly spread in the beginning of the condensed concrete surface The third step: the first mention of pulp: to be a certain amount of water to absorb the material, the use of mechanical pulp lifting operations, and leveling with leveling The fourth step: the second sprinkle material: to be abrasive hardening to a certain stage, and then the provisions of the amount of 1/3 extension up abrasive for the second spread operation The fifth step: the second pulp: to be a certain amount of water to absorb the material, the use of mechanical pulp lifting operations, and leveling with leveling Step 6: mechanical trowel light: according to the hardening of the floor, the use of mechanical trowel light finishing operations Step 7: conservation: floor finishing is completed, the film conservation or recommended special curing agent conservation
Concrete label is not less than C
The first step: concrete construction requirements: according to the design requirements of pouring concrete, elevation to positive and negative zero