Floor before the floor is good or good floor mats treasure?
The first step in the work before paving the floor is the primary treatment, mainly for repairing the ground on the issue, the formation of a new base, avoid hollowing and cracking because the original base caused by the floor arch. And after the grass-roots level, it is necessary to leveling the ground. If the ground is not smooth, not only will cause the baseboard to have the crevice, the overall floor also can not be smooth, and has the unusual sound, but also seriously affects the floor quality.
Pre paving before the formal paving, the floor according to the color and texture as much as possible the principle of placing, in the process can also check whether the floor has a big head or end cracking and other issues. If you are satisfied with the pre laid, you can fix the floor, paving the pavement. It is worth noting that the keel touching the floor must have a nail fixing. In the fixed floor, we should pay attention to whether the end of the floor cracks, adjacent floor height difference is too large, or the gap between the plate and so on.
After the self leveling is done, the floor mat is ready until the floor is dry. The common floor mats in the market are made of aluminum foil and polyester materials. They are laid close to the ground and play a role in leveling, moisture proof, moisture proof, vibration reduction and floor protection.For laying wood floors, the ground leveling requirements as strengthening parquet floors and so harsh, and a keel is the most important link, according to reports, the wooden keel material for Chinese fir or pine. The height of the keel depends on the ground condition, but not less than 1.5 cm, and the width shall not be less than 3.5 cm. Need to be reminded that, after a keel to do after cleaning and cleaning, and then evenly release moisture proofing agent, insecticide.