How can I lay a carpet on an iron sheet in winter?
The wall around the ground with concrete nail on a wooden card along in the room. It is a wooden card splint in about 25 to 30 mm wide, 5 mm thick strip, from the bottom to the top is embedded in two or more rows of rust nails, all the nails to the wall should be slightly tilted, nail tip post length can not exceed the thickness of the carpet, the best with two operations at the same time to the carpet in the opposite direction to a wooden card taut and nail the nail tip and then fastened to a wooden card on the carpet, and the paving compaction.Double sided pressure-sensitive carpet stitching application with adhesive, the seam should be straight stick. The carpet junction edges or other surface materials, application of Aluminum Alloy pressing strip pressing edge, so as not to loose or damaged carpet edge.
Before laying the carpet, the surface of the base should be cleaned first. Such as laying wood floors, the floor should be loose or damaged repaired. If it is laid on the base of cement ground, the concave and bulge of the ground shall be inserted and gouged. If the cement surface is easy to damp, you can brush the cold base oil or spread a layer of asphalt paper.Carpet laying shall be designed before laying. Such as carpet splicing, should be placed in an inconspicuous place or to the seam is not easy to suffer harm. Along the wall should be left 1 mm gap. Splicing should pay attention to the direction of the same hair, so as not to cause color difference.
Carpet paving generally has two kinds of methods, one is the simple paving method, is the carpet with a stick adhesive on the ground, also known as B pavement; another way is to put a layer of rubber or foam cushion on the ground, and then pave the carpet at the top, and around the edges with dowel bars will fix the carpet the carpet, splicing place, need to use hot zone will be two pieces of carpet bonded together, this approach is called a pavement.