How do we build artificial turf on the gate?
The artificial turf to the ground, vertical open, open from the open side to side slowly smooth; this can better check the artificial turf quality meets the requirements, and let the grass up in the sun.
First, the machine to cut grass covered in turf grass outside the line of resection, on the side of reserve; the seams of chopped grass are connected together, try to make the joint consistent two piece of turf to cohesion; connect the cloth of artificial turf in turf seams place shop, glue on the connection of fiber cloth and cloth on the corresponding artificial turf.
Clean up the site, clean the site, and check the basic works such as slope, roughness and so on, so as to facilitate the process of the later stage.