How does the pipe machine operate?
The contents of the inspection requirements of the equipment required to fill in the site inspection records, a person in charge of the inspection and signature; for the discovery of equipment requirements in a timely manner reported, supervisors and workshop director to make comments, and report the results reported production
Temporary maintenance in the shift and replacement process time to solve the normal maintenance as planned to complete; all maintenance should be planned, can not be carried out, the hidden dangers of the equipment should be forward-looking, can be done in a timely manner, and ready to deal with ready
Supervisors, pipe fittings in the transfer of the production team when the team leader and the engineers on their posts to use the equipment to be checked, not to the equipment to the get off work to continue to use the company according to the production and equipment operation to develop maintenance plans, minor and
Site equipment must have a professional engineer to manage the responsibility, every day to the equipment under the jurisdiction of not less than 2 times inspection; maintenance personnel for the jurisdiction of the production equipment to do not less than 4 times the inspection work; for production