Home > categories > Machinery & Equipment > Concrete Batching Plants > How long does it take to build a concrete mixer station?
Question:

How long does it take to build a concrete mixer station?

How long does it take to build a concrete mixer station?

Answer:

The main idea is that the goods are completely incomplete, and the crane, the manpower, the mechanical tools. If everything is in place, then the pure installation will be two weeks to a month. Of course, also see you buy what type of product, container type is compared commonly faster, smaller and faster, under 3000 type slightly faster, 4000 and 5000 slowly
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.
The core part of the stirring station: stirring the host, electronic control system, weighing element and instrument. The mixer should choose to use the stirring stability, the maintenance is simple and convenient, the service life is long, the match is supplied with the sufficient production plant. The electric component must choose the international brand products, preferably the imported original product, to guarantee the reliable; The software of the computer system shall be developed by the manufacturer in order to be upgraded and replaced in the future. And there should be a pro version of the software (piracy is prone to malfunctions and possible intellectual property lawsuits).