How long does the width of the template support more than how much height the beam can not be poured at the same time?
Tool-based template works: including sliding mode, climbing mold, flying mold works. Concrete template support works: erect height of 8m and above; erection span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above.
Beam, plate at the same time pouring, pouring method should be started from one end with the "cuping method", the first pouring beam, according to the beam high-level pouring into a stepped shape, when the plate bottom position and then with the board of concrete pouring With a continuous extension of the ladder, beam concrete pouring continuous forward.
Height of more than 8m or span of more than 18m, the total load of more than 10kN / m2 or centralized line load greater than 15kN / m template support system and the use of beam plate at the same time pouring concrete construction method to immediately stop construction.