Question:

Template support did not stand good, how to remedy the lower floor?

Template support did not stand good, how to remedy the lower floor?

Answer:

The sinking of the local template demolition, concrete smashed, re-playing concrete, although not in line with the provisions, but the project often do so, you know
In fact, found before pouring in the jack can be used to jack up the reinforcement, in the corner of the ramp support; see how much sink, if the tolerance within the allowable time to the top of the ceiling with a network of paint on the OK; if more than the standard requirements only play Chiseled, it is recommended that all chisel, it is best to hit the wall position in the beam before pouring pulp.
First measured how much sink ah, the plate elevation measured first, and then find the design, such a thing is not you can decide, the design may be looking for experts, if the lower 10 to cm it does not matter. But also the size of the kanban, if you say 4 * 4 little problem.