How long is the hotel furniture production cycle?
Hotel furniture proofing is generally about 15 days, after confirmation of samples, batch production cycle is about 40~50 days.
We must note: because of the specific circumstances of each hotel project is not exactly the same as the previous plan to continue in the furniture and repeated modification, size measurement, paint process, sample confirmation will consume a lot of time, so to advance planning and arrange the time to avoid delays in hotel project progress.