The preparation of a report or statement. During the compilation process, any problems should be actively communicated with the construction side. For example, dust collector selection, environmental protection investment, total emission approval. (especially the total emission, you must let the construction side and communicate with the environmental protection bureau to get the total amount, otherwise you write the EIA does not make any sense.) Generally speaking, the preparation of the report is longer, about forty days; and the preparation of the report table is shorter, about fifteen days.
1, first of all, the EIA unit and the construction party signed the EIA contract. The contract is only legally valid. Generally speaking, the contract will indicate that the first payment has been received before the work begins.2. Collecting information. This is a very important link in the EIA, which is directly related to the quality of the eia. There is a great variety of data,Generally, the construction party will write a list of environmental impact assessment information.
Give you a list of data, you can refer to. List of required data for environmental impact assessment 1) name, type, specification and quantity of main process equipment. 2) the supply and consumption of raw and auxiliary materials (annual consumption and unit consumption of raw materials, ingredients, electricity, new water and recycled water). 3) public utilities: power supply system: need to build several substations? What is the size of the substation? Water supply system: fresh water consumption, circulating cooling water consumption, domestic water consumption, production water consumption, fire water consumption, respectively, how much? Heating system: if the project has a self heating system, the size of heating boilers, types, scale, fuel types, sources, annual consumption, the boiler's circulating water supply.