How to finish turf installation?
In the turf installation problem, in the laying of support layer, special attention should be paid to ensure there is enough water permeability, but the main or robustness. ? In addition, support layer pressure and thickness is determined by the assumption of pressure, such as carrying a car need thirty cm in thickness. ?
We need to pay attention to that at the bottom of the lawn, staggered can make its good fixed installation on the ground. May need to be as required in the whole region outside box or use screws should be fixed, in order to avoid the lawn, the possibility of thermal condition, must set aside between each lawn, the aperture of 1-1.5 cm. ?
I think that install the lawn before, must first on the support layer laid a 2-3 cm thick layer of sand/sand mixture. What's more, as well as in a row, can also be trapezoidal arrangement. The lawn, shall be spliced in good condition, can use the universal tool to make arc or other model. White logo block can be embedded in the lawn.