How to fix the sidelines of the bathroom
Install the aluminum plate
Installation of smallpox aluminum plate, along the flanging part of the order of light pressure, the square board on both sides of the card completely after the keel, and then push, is strictly prohibited brutal loading and unloading; and the edge of the aluminum card card straight side fixed aluminum plate. According to the different design requirements of the project ceiling with different specifications of the punching aluminum plate, the conventional size of 300mm × 300mm, different brand size is often not the same, consumers need attention.
Install lamps and vents
According to the ceiling layout plan, layout lamps and vents; installation of aluminum plate at the same time, according to the size of lamps and vents out of the hole, the installation of lamps and vents.
Install the keel
According to the design of the main keel spacing, the sub-keel through the triangle pendant, hanging in the main hoop, the sub-keel, the sub-keel, Keel; when the length of the keel to be extended for a long time, with the keel connection, hanging in the keel at the same time phase, straighten the fixed.
Install the edge of the aluminum bar
Conventional aluminum side of the specifications: 25mm * 25mm, the installation of the ceiling requirements of the wall around the wall with cement nails fixed aluminum.
Install the main keel
Equipped with a boom nut, in the main keel on the pre-brand hanging pendant, will be assembled hanging pendant of the main keel, according to the sub-file line position so that the hanging pieces into the corresponding boom bolts, tighten the nut, Install the connector, pull the line to adjust the elevation and straight, install the hole to attach the main keel, set and connect the card.
Install the main keel boom
After lifting the elevation level of the ceiling and the main keel position line, determine the elevation of the boom under the head, according to the main keel position and hanging spacing, the end of the bolt without screw wire with expansion bolts fixed under the floor; conventional size boom With 6m steel bar (8mm flat steel).
Bears
According to the level of the floor level, with the ruler vertical volume to the ceiling design elevation, the top plate in the keel position on the line, and the ceiling of the horizontal line on the wall.