7, the flue is thin-walled components, in handling and installation should be gently handle, not to impact, not in the pipeline to pile other heavy objects and walking.8, the roof flue should be in the roof insulation layer, fire layer before construction.9, the use of gas water heater exhaust system is strictly prohibited.
4, the installation of flue should each layer as bearing, bearing steel 2 root diameter over 14mm?.5, after the installation of the flue, in each flue check valve of the reserved installation of fire type flue check valve, with special glue mixing cement, coated with a check valve installed in the valve hole edge, and then back to the reservation in check at.6, the construction should be reserved at all levels of the hole, covered with a cover plate, to ensure safety in construction, to prevent construction waste fall into the flue.
1, vertical transport, the flue should take protective measures, and must be two lifting.2. Locate the center line of the flue position. In the reserved hole, draw down four vertical central lines from the roof, and draw 2 orthogonal central lines on the floor plane.3, the flue to the scene, the first flue hanging to the roof, surrounded by the center line of pop in the flue, and the flue of the reserved hole slowly down the electric hoist, from top to bottom layer installed flue in place, the center line correction. The center line of the flue and the center line of the reserved hole should be less than 1cm, the deviation of the centerline of the upper and lower flue is not greater than 1cm, and each flue must be guaranteed vertically and vertically.