How to install the wooden door of the bamboo pattern
Door and window installation method?
?▼ wet door frame installation
?Hole deviation greater than 10mm and the use of cement mortar after finishing the hole, doors and windows fixed with the civil structure of the connection prohibit the use of nail fixed. Should be fixed with nylon expansion screw.
?▼ wet combination of windows to fight material installation
?1, fight Tang material up and down the port should be blocked;
?2, fight the material should be designed to lengthen the structure and reliable connection;
?3, the combination of doors (window) box and fight Tang material card, the application of fasteners two-way tightening, the spacing should not be greater than 400mm; distance between the two ends of not more than 180mm; fight material door (window) Seal the glue for sealing treatment.
?▼ dry door and window frame installation
?1, the main sub-box installation gap should be strictly according to the main sub-box design gap on-site quality control. After the completion of the installation of the main frame of the actual gap should not be less than 4mm.
?2, the main and auxiliary box gap control should be used for the main sub-box gap adjustment block. Do not use fasteners to tighten control of the main and auxiliary frame gap.
?In fact, after the windows can be installed, we check the windows are not solid. For example, holding the window frame shaking and so on, are able to check the degree of solid windows. The above is for the doors and windows of the construction process and the installation of doors and windows of the talk about the hope that can help to the needs of friends, so you can avoid the windows do not appear dangerous dangerous events!
Doors and windows installation method, wooden door installation process
??In fact, the vast number of consumers do not know, although their doors and windows are installed, but its norms are little known, doors and windows of the installation specifications are not standardized to see the manual process and doors and windows installation methods of these two, I believe we all listen Said someone was falling from the window, which is the installation of the window is not strong, so the installation of the doors, windows need to pay attention to the installation of some problems.
???Construction technology
??First of all the process, the installation of the preparation - temporary fixed window frame - correction - fixed window frame - to send plastic - install sash and hardware - playing sealant - installation of glass
???Window frame installation key technical requirements
???You can do a model, do a good job, after acceptance after batch installation, to prevent large-scale renovation of the situation. So it is recommended that the first measurement and then make, do field measurement, reduce the window vulnerability.
??Large deviation window hole window frame installation
??Each floor of the balcony window concrete column board pops up the horizontal line, the horizontal line elevation distance window hole bottom elevation 250px, measured the lowest point of the beam and the highest point of the concrete rail to meet the installation requirements of the window frame can be installed.
?Window frame installation to the inside of the concrete bar board as the standard, the installation is completed, the window frame part of the floating, plaster construction to strengthen the network to repair, curved fence outside the use of vitrified beads adjustment.