My method is to drop the material (the bucket is down a little and lift the big arm) Is the material correct?
then the arm up to about the middle position, pouring, and then to come back again and again, this time I am afraid that you don't put a bucket arm, estimated bad rise, repeat, do not try to let the tire slip, piled up, what time your car ass after you are, remember to make from the front, not from the side.
Put the shovel flat, slowly toward the heap, hanging 1 block, insert the stack must be with the throttle, into a walk, lift arm slowly walked up, if l does not move first hopper, or arm, why is walking up with the arm slowly raise when the car has to follow the forklift in front of the material will become a slope,
Personal habits, the reasons for it! However, when the bucket is turned down, try not to lift the big arm, which will damage the middle arm cylinder. It is better to have a good position and dump the bucket directly, so that the damage to each component is the smallest