Then the floor side rolled up, rolled on the ground in the glue scraping evenly, until the viscosity of solvent containing glue on the ground to produce the volatile after then paste, paste in the hand to the floor to the same direction of pushing on the glue on the floor can not let the air inside.
The first floor sheet ground floor flat on the ground, more than 8 meters distance laying the floor shall be divided into two period of laying.
1 ground measurement2 self leveling construction3 pre laying long Yu plastic PVC floor4 scraping glue, laying PVC plastic floor5 cleaning site
Glue volatilization time changed according to the construction temperature change, such as in the room temperature of 20 degrees Celsius, the glue volatile time of 30 minutes, the white glue into Anti transparent, do not have a strong cohesive touch frictioning surface by hand, then can paste. Timely paste can ensure that the floor can not afford no bubble.