Home > categories > Electrical Equipment & Supplies > Cable Ties > How to train the dog to the designated place of urine
Question:

How to train the dog to the designated place of urine

How to properly remove air conditioning in the absence of electricity

Answer:

1. Fluoride: then the external machine of the high-pressure valve (thin tube) with a hexagonal wrench, closed, about 1-2 minutes after the closure of low-pressure pipe (thick tube). 2. Remove the pipe: with a movable wrench to high and low pressure pipe copper screw unscrewed. 3. Remove the internal and external cables. Open a plastic cover outside the machine, cable terminal can be seen, with a screwdriver screw off, remove the cable. (Do the mark, so as to avoid the next installation to line) 4. The machine (hang up) off, attached to the pipeline out. (Note: If you do not install a long time, also need to transport, it is best to tie in the pipeline on the cable removed, find the pipe and the machine's connecting nut, with two wrenches, And then the pipe plate is good) 5. Remove the wall of the machine hanging plate. (Hang up) 6. Remove the external machine, with two wrenches, the external machine 4 feet screw off, if the rust die also use the grinding machine to wear off the foot screw
Install the rack panel, the front should be left 1.5m space, the back of the rack from the wall should be greater than 0.8m, to integrated wiring system engineering system debugging, including cable, information outlet and wiring module testing. The tests should be
Installed with a line, dark with a line tube. Ming with the trunks more beautiful.

Share to: