Question:

Installation and commissioning of hydraulic press

Installation and commissioning of hydraulic press

Answer:

The factory of the machine in accordance with the relevant provisions of the factory have made the factory test, but due to long-distance transport and a long time to place and other reasons, the installation of hydraulic brick should be the following checks:
If the machine needs to be removed due to transport needs can be divided into forming device, delivery device, feeding device, brick device, palletizing device, phase control device, installation according to the assembly relationship in place.
4, in addition to the hydraulic brick machine to carry out a comprehensive paint on the work, before the test machine but also on the movement of the parts of the relative sliding parts of the required lubrication.
3, check the working parts of the cylinder and the lubrication point is required to refuel, oil is appropriate.
1, check the brick machine in the transport process is damaged or deformation (especially pay attention to hydraulic pipe).