Is the warm tube laid on top of the steel wire or below?
on the maintenance of the warm tube I told you to see what you use the pipe to decide, if the use of high temperature polyethylene PE-RT material, then you can use a dedicated interface to hot-melt connection to repair, if used Is the coach polyethylene PE-X pipe, then it is difficult to deal with,
it is unreasonable to warm the pressure is the provisions of the state, the general pressure after the pressure in an hour after the pressure change in the 0.02-0.05 between the normal, because the pipeline itself has a swelling and contraction process, As he did is to warm the pipe has been damaged
To warm the pipe is in the wire mesh above, because the main wire mesh is the role of a fixed warm tube.
and that the road is broken, then the loop must be replaced by all the warm pipe, which means that your room layout of the road to warm all the area to all Out of all to replace the new pipe to replace.