Two, weaving process:1, from top to bottom, from the needle 170, plus the needle to the needle 200.2, the sleeves of the 48 needles, needle pick up the needle 29. 12 small needle. The remaining 59 stitches.3 minus two, waist needle. 19 stitches per time. Hip with needle two, hem 219 needle.4, collar workers 178 needles, the needle after the 6 line, the remaining 154 needles.
In 2, after pieces of fabric: 8 lines, flat 8 plus axillary needle, connecting piece 208 needle fabric before and after 17cm, then even minus 10 No. 13 single needle knitting thread edge, the edge length of 5cm.3, No. 13 needle sleeve: provoke 16 needles, plus the left 60 pin, 76 pin sleeve, and then reduced to 54 needles (5-2-5, 7-2-6), and then were reduced 6 knitting single thread.
How to knit a sweater:1, from the top down, 120 knitting needles (single thread double thread more beautiful) about 2cm, a flat and uniform fabric and needle needle 12, a total of 132 needles, and then take 6 group (my flower row with graphic is not the same, the reason is not the same as the number of needle plus no beginning the map to find a clear solution, did not see the sisters can be designed according to the flower row clear diagram), according to the pattern of down fabrics, woven into the 5 Figure 312 when the needle sleeve, before and after the film of the 96 pin, 60 pin sleeve.